BackonTrack,
I remember KN#1 pretty well, 40 mmcfd thro' a 1.125" choke.
Anyways back to GDN. Details for their first well PB#1 are as under.
Formation Tested: Upper Ismay
Thickness: 51 feet
Flowed rate: 1.168 mmcfd
Choke: 24/64" (or 0.375cm)
Pressure: 510 psi
Since the insitu pressure was hardly enough, they flowed it thro' a smaller orifice (referred to as the choke size).
Another DST, flowed water for a separate section which was cased eventually, so technically we have 1.168 mmcfd on the table. This could b improved if they chose to frac it at a later date, which I doubt.
The management's focus should b on PB#2, its on a structural closure with better shows reported till date.
cheers
- Forums
- ASX - By Stock
- GDN
- paradox basin no 2 update ...
paradox basin no 2 update ..., page-61
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)