Complete testing should b at the end of the well NT.
Have been on wells where Operators flow them as u go, but these days Operators tend to b more cautious about downtime & stuff-ups. So they run logs when they reach casing point & then do conduct a DST at TD.
GDN will run a 2.75" production tubing on reaching TD (no DST with this rig) & get a smaller rig to the extended testing late Q2-'09 onwards.
cheers
- Forums
- ASX - By Stock
- GDN
- speeding ticket?
speeding ticket?, page-21
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GDN (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
SS1
SUN SILVER LIMITED
Gerard O'Donovan, Executive Director
Gerard O'Donovan
Executive Director
SPONSORED BY The Market Online