plough
HEG are apparently grinding down to 250 microns to get 97% recovery (maybe I should check those numbers)
this suggests almost no rock "dust" in the tailings and therefore suggests no problem about using it much the same as washed beach sand for concrete batching
I'm expecting that MCO's optimum grind size will not be much different - a little less maybe but we will have to wait and see