Ned
The numbers in the last chart are the thickness (m) of high grade IO
Here are the hole numbers in the chart below...........
It seems to thin out near the outside (the previous chart with the intersection thickness shows that), but encouraging they are doing another km of drilling. The announcement pretty much says that the lode is bigger than thought.....
To define the final pit design, the Company has decided to extend the drill program
due to continuing near surface hematite intersections south, west and east of the
main lode.
- Forums
- ASX - By Stock
- TI1
- Ann: First Infill Drill Results
Ann: First Infill Drill Results, page-17
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TI1 (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $1.208M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
TI1 (ASX) Chart |
Day chart unavailable