This is very positive news as potentially will expand mine life for a very long time. Depth is not a big issue as most of the Capex development will have been paid for by lead/silver deposits on the way down. Also the planned mine design with a straight decline down to ore optimises haulage from depth as truck turn will be much quicker.
Things are progressing well, I’m hoping soon we will see announcements for underground contractor and commencement of development and things will move quickly from there.
$1 by the end of the year.
GLTA DYOR
- Forums
- ASX - By Stock
- G1A
- Ann: 1st Targeted Copper Hole at Abra Hits 26.9m at 1.4% Copper
Ann: 1st Targeted Copper Hole at Abra Hits 26.9m at 1.4% Copper, page-25
-
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add G1A (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $44.40M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
G1A (ASX) Chart |
Day chart unavailable