    The Doc has already said long term they were looking at doing what Resolute have done at nearby Syama. This is a hybrid combination of solar, battery and traditional generation. There was no upfront cost, Resolute buy the power from the provider. (link below)

    The Quarterly said we were using Jozi power to provide temporary power. Looking at their website, they rent out various generators which are built into shipping containers. This would be quick to implement, just hook it up. With only minor reconditioning of the plant being required, I can see them processing that material that was mined from the tailings dam floor & transported to the crusher run of mine ore pad well ahead of when they start mining in May/June + any other stockpiles. Why else would they haul it there? They don't need the full crushing circuit to process oxides. Pit 5 would be looking good to go as well. There will be little oxide at N'Tiola, so that will need the full circuit.

    https://www.miningmagazine.com/power-remote-power/news/1376477/syama-to-move-from-diesel-to-hybrid-power
 
watchlist Created with Sketch. Add FFX (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.