Hi aurumasx lol It's not 1.9MT WO3 that Icon are looking at - you have confused that figure with the ore containing the % of WO3. For example:- Using Icon's figures,
The tailings contain 1.6MT of material grading 0.11% WO3 = 1760T WO3
The open pit contains 1.05MT of material grading 0.1% WO3 = 1050T WO3
Beneath open pit contains 9.6MT of material grading 0.2% WO3 = 19200T
Of course these estimates are exactly that - estimates. They need to be verified, which is what Polymetals are doing at the moment with the tailings and further drilling in and around the pit may confirm
III Price at posting:
6.8¢ Sentiment: None Disclosure: Held