BRK 4.55% 1.1¢ brookside energy limited

how long to drill, page-3

  1. 1,308 Posts.
    lightbulb Created with Sketch. 1064
    https://hotcopper.com.au/data/attachments/3144/3144960-4b5ece84ae28ea421bc95a8ac794e17e.jpg

    Takes 2-3 months from spud to first production. Spud has been delayed since this diagram was produced - should be happening this week. In terms of oil they are drilling smack bang in a producing oil field so high likelihood the oil is there. That is why the company are saying exploitation not exploration....exploitation in that they are extracting oil that they have a high level of confidence is there. There is a risk the drill itself get stuffed up...risk is low as these guys are experienced.
 
watchlist Created with Sketch. Add BRK (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.