The maximum amount they can produce is not something that any of us can decide or even determine. The PFS will be out by the end of June and it will contain information on the way forward. However management have indicated that they want to start small with a low cost setup and increase overtime. Once in production, Razorback will have a long mine life, plus extra unexplored tenements available to dig up, along with the Muster Dam area that they can mine with 1.5 Billion tonnes. With the NextOre technology available to them, they may be able to pump out even more than what the PFS will indicate.
MGT share price, page-6076
-
- There are more pages in this discussion • 7,853 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MGT (ASX) to my watchlist
(20min delay)
|
|||||
Last
25.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $25.55M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 949 | 25.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
23.0¢ | 950 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 949 | 0.255 |
3 | 15253 | 0.250 |
1 | 2273 | 0.245 |
3 | 25833 | 0.240 |
1 | 5000 | 0.230 |
Price($) | Vol. | No. |
---|---|---|
0.230 | 950 | 1 |
0.260 | 10250 | 2 |
0.265 | 3773 | 1 |
0.270 | 3703 | 1 |
0.275 | 10000 | 1 |
Last trade - 08.39am 06/08/2024 (20 minute delay) ? |
Featured News
MGT (ASX) Chart |
Day chart unavailable