There was initial drilling done in the last 1-2 years which shows the mine is viable, and if Copper goes to $6k a tonne, then it's still a $2 stock as a minimum.
However new drilling starts this month at some point and Bill wants to go way deeper than the original drilling.
It's those new deep drilling results that will either drive the share price to the stratosphere or keep it on track to $2+ in the next 12-18 months, roughly speaking.
I've decided to stay on the HOLD side of those results and I wouldn't be surprised if the results were released at the time the 8c options are available. Hence a chance to stop any short term 'sell-off' of profit-taking etc
I have asked this forum if anyone has any insight into that date as it's literally a short-term game changer?
- Forums
- ASX - By Stock
- DVP
- Mr VXR, Bill Beament
Mr VXR, Bill Beament, page-184
-
- There are more pages in this discussion • 137 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add DVP (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.98 |
Change
0.000(0.00%) |
Mkt cap ! $509.6M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 51 | $2.05 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.95 | 640 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 51 | 2.050 |
3 | 118 | 2.040 |
1 | 208 | 2.030 |
2 | 287 | 2.020 |
1 | 300 | 2.010 |
Price($) | Vol. | No. |
---|---|---|
1.950 | 640 | 1 |
2.000 | 310 | 1 |
2.030 | 4000 | 1 |
2.050 | 2055 | 1 |
2.150 | 5000 | 1 |
Last trade - 13.24pm 18/09/2024 (20 minute delay) ? |
Featured News
DVP (ASX) Chart |
Day chart unavailable