MGT 9.09% 25.0¢ magnetite mines limited.

Ann: Razorback Iron Ore Project Mineral Resource Upgrade, page-55

  1. 934 Posts.
    lightbulb Created with Sketch. 153
    Shocking grades 16%, waste of time. You need 4 tonnes and to process them to get one tonne of ore. So many better projects out there, only economic because iron ore is 200 a tonne
 
watchlist Created with Sketch. Add MGT (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.