CR1 constellation resources limited

ATH today WHY ?, page-23

  1. 554 Posts.
    lightbulb Created with Sketch. 254
    @whitepages127 Here's free of charge timeline of a typical exploration company work program and where CR1 is currently positioned. If you ever had to invest some money, take it from daddy panza and throw in a few dollars within next 2 months while this is still cheap. You can thank me later when you make some money.

    Year-1
    1. Literature survey, reconnaissance License, regional geological check, mapping, and rock-chip sampling.
    2. Acquisition and interpretation of available airborne geophysical data from previous surveys.
    3. Identification of prospective geological packages/structures.
    4. Regional geochemical surveys: Soil/stream sediment sampling as required.
    5. Regional airborne geophysics, ground magnetic, and electromagnetic traverses as required.

    Year-2

    1. Integration and interpretation of geological, geophysical, and geochemical data to identify anomalies/targets (could be geological, geochemical, and geophysical).
    2. First-pass followup of anomalies/targets by detailed mapping, infill soil/rock-chip sampling, and ground geophysics.
    3. Prioritization of anomalies/targets for drill testing.
    4. AC drilling of interesting targets.

    Year-3

    1. Second-pass followup and target definition (we are here).
    2. Reverse circulation/Diamond core drilling
    3. Downhole geophysics and drilling, if required.
    4. Reports/Recommendations.
    Last edited by sanchopanza: 26/05/21
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
12.0¢
Change
0.000(0.00%)
Mkt cap ! $7.564M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 10834 12.0¢
 

Sellers (Offers)

Price($) Vol. No.
15.0¢ 25000 1
View Market Depth
Last trade - 16.12pm 20/06/2025 (20 minute delay) ?
CR1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.