TI1 0.00% 1.4¢ tombador iron limited

Ann: Second Infill Drill Results, page-56

  1. 219 Posts.
    lightbulb Created with Sketch. 105

    Correct Barrier!

    First shipment next month will be circa 30Kt. Do the math @ US200/t = first cash flow of US$6m (say A$7.7m)

    It’s a Brazilian Cash Cow!

    Regards

    Pihrana
 
watchlist Created with Sketch. Add TI1 (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.