Hiya Shaq, that’s from the horses mouth so to speak.
Read between the lines though, the original as you have suggested maybe we’ll correct on a Phase11 construction of 3x resources, hence the bottom line of CapEX being 65m.
The upside is, if and only assuming we are now at Qtr 4 2023, this is going to be a very very big plant.
25x the micro being built. At that level RLT are well positioned to supply domestic LNG. An only supplier to a country of 60m+ whilst their coal fired is falling apart. Then the helium is abundant on those LNG takeoffs.
Dont for a second underestimate how big Phase11 could possibly be, the bigger the better, the longer construction will take, whilst in the meantime Phase1 earns revenue.
- Forums
- ASX - By Stock
- RLT
- RLT CHART
RLT CHART, page-39
-
-
- There are more pages in this discussion • 827 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RLT (ASX) to my watchlist
(20min delay)
|
|||||
Last
76.0¢ |
Change
-0.020(2.56%) |
Mkt cap ! $23.04M |
Open | High | Low | Value | Volume |
78.0¢ | 78.0¢ | 75.0¢ | $5.33K | 7.021K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 10242 | 75.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
75.5¢ | 2 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 10242 | 0.750 |
1 | 25000 | 0.745 |
1 | 25000 | 0.715 |
3 | 16385 | 0.700 |
1 | 750 | 0.650 |
Price($) | Vol. | No. |
---|---|---|
0.755 | 2 | 1 |
0.760 | 13844 | 1 |
0.800 | 3000 | 1 |
0.880 | 47000 | 2 |
0.885 | 9187 | 1 |
Last trade - 13.45pm 15/11/2024 (20 minute delay) ? |
Featured News
RLT (ASX) Chart |
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Will Souter, CFO
Will Souter
CFO
Previous Video
Next Video
SPONSORED BY The Market Online