ELK elk petroleum limited

snippet in pnn

  1. 336 Posts.
    I know we all know this but its nice to get a mention in PNN.

    Over in Wyoming, Elk Petroleum said it would complete the Grieve-39A well at the Grieve field as a potential injection/production well once wireline logs were complete.

    The company said the well was drilled to a total depth of 6821ft and recovered core from the Muddy A and B reservoirs.

    Grieve-39A was drilled to obtain fresh core material from the Muddy sandstone reservoirs to allow independent reserve verification, final facilities design and updated economies leading to a final investment decision for a chemical flood-enhanced oil recovery project in the Grieve field.

    The well is located next to the existing Grieve-39 well, which produced small amounts of oil in 2005 with initial flow coming from the Muddy sandstone reservoir.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.