BotsGas has farmed into the Serowe CBM Gas Project because:
- PH2 and BotsGas share the same vision of a stable green Energy Hub within Botswana
with the future potential to support wider regions- PH2 has a 6 Tcf (trillion cubic feet), Independently Certified Prospective Resource on its 100% owned Serowe CBM Project, with ~2.4 Tcf potentially located within a high grade area1
- PH2 is targeting the Serowe coal seams, as the following properties result in best production rates, lower operational costs and less technical risk:
- Shallow (~250 to 500m depth; 12m coal over 50m gross interval)
- Gaseous Coal (80-100% Gas Saturations )
- CBM can be readily abstracted by a series of low-cost, vertical wells
- No horizontal drilling and fracking required
PH2 is led by Ron Prefontaine, as Chairman, a noted CBM specialist, who leads a team with proven CBM and significant value adding expertise.
- Forums
- ASX - By Stock
- PH2
- Botgas and Serowe
PH2
pure hydrogen corporation limited
Add to My Watchlist
2.38%
!
10.3¢

Botgas and Serowe
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
10.3¢ |
Change
-0.003(2.38%) |
Mkt cap ! $38.28M |
Open | High | Low | Value | Volume |
10.0¢ | 10.5¢ | 10.0¢ | $4.132K | 41.06K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
36 | 1005591 | 10.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.5¢ | 156555 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
36 | 1005591 | 0.100 |
2 | 25555 | 0.099 |
1 | 70000 | 0.098 |
2 | 141186 | 0.097 |
2 | 114582 | 0.096 |
Price($) | Vol. | No. |
---|---|---|
0.105 | 156555 | 4 |
0.110 | 78897 | 4 |
0.115 | 358061 | 5 |
0.120 | 579247 | 15 |
0.125 | 565784 | 9 |
Last trade - 15.16pm 22/08/2025 (20 minute delay) ? |
Featured News
PH2 (ASX) Chart |