    People say tomorrow is laughable lol.

    22nd was completed 1 n 2nd hole.
    600m on those holes.

    drilling for 1 hole depends on ground. Should take 3 to 4 weeks to get an report.

    so 22nd to 4 weeks is around 20th of july.
    If they have 2 rigs then they can do 2 holes
    But could be upto 6 to 8 weeks useing 1 rig


    the asx cod drilling is around 800m n they taking 4 weeks to dril 1 hole.

    so hopfully that gives a better understanding.

    maybe email ceo n ask how long does 1 hole takes.
 