Only talking with the benefit of 40 years experience as a mining engineer and the knowledge that I am frequently wrong. there is a right way to go about developing a mineral project and a lot of wrong ways. There are repeating warning signs about projects that go off the rails. This one has a couple. The first is skipping from pea to dfs. The second is quoting all sorts of financial metrics on a pea basis. The latter is allowed on tsx but generally a no no onnasx where pea is not recognised. Have a read of info 214 and have a think.
. https://asic.gov.au/about-asic/news-centre/find-a-media-release/2016-releases/16-111mr-asic-releases-information-sheet-214-mining-and-resources-forward-looking-statements/
grade is one thing but costs and level of confidence in estimates of grade and costs important. The confidence in both is reflected by the category or Resource/reserves.
It may be one of the highest tin grades around but its a primary cassiterite so it needs to be crushed and ground before processing. That makes it not directly comparable on a grade basis to an alluvial tin deposit where power intensive/expensive grinding circuits are not needed. It needs to be compared on a $/tonne of ingot basis.
that metric and the confidence in it it’s an outcome of the level of engineering underlying the estimate
- Forums
- ASX - By Stock
- ELT
- Ann: Oropesa DFS Commencement
Ann: Oropesa DFS Commencement, page-22
Featured News
Add ELT (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.0¢ |
Change
-0.006(7.89%) |
Mkt cap ! $15.27M |
Open | High | Low | Value | Volume |
7.3¢ | 7.4¢ | 7.0¢ | $14.68K | 205.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 52854 | 7.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.4¢ | 100000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 52854 | 0.070 |
1 | 400000 | 0.054 |
2 | 42760 | 0.046 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.074 | 100000 | 1 |
0.076 | 44999 | 2 |
0.078 | 85391 | 1 |
0.079 | 41893 | 2 |
0.087 | 25300 | 2 |
Last trade - 16.10pm 08/11/2024 (20 minute delay) ? |
Featured News
ELT (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online