Hi Wallaby this is out of my comfort zone. Not that I am selling but the processing after crushing rocks into slurry /brine is not areas I have much experience in. I still dont know how this deal was pulled off this is a huge plant the ball Mills are huge and more than one.Just to explain they load up with big rocks and rotate with steel balls inside to crush the rocks into a slurry that is then filtered or processed into a final product. I am sorrry but I dont know all the lithium down stream stuff do this do that type of things but based on the handrail and scaling this is bigger than I thought it was. Every hand rail is around 1100mm high so factor that in when you look at a photo and scale it in, this in no backyard shed factory. Its 3 to 4 stories high by my observations. Lets stop posting and get some more cheap.
- Forums
- ASX - By Stock
- SYA
- General Discussion Topics
General Discussion Topics, page-11660
-
- There are more pages in this discussion • 129,669 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SYA (ASX) to my watchlist
|
|||||
Last
3.4¢ |
Change
0.001(3.03%) |
Mkt cap ! $349.9M |
Open | High | Low | Value | Volume |
3.3¢ | 3.5¢ | 3.3¢ | $1.368M | 40.39M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
44 | 13154629 | 3.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.4¢ | 636953 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
43 | 12854629 | 0.033 |
181 | 44374372 | 0.032 |
70 | 23528083 | 0.031 |
110 | 17095660 | 0.030 |
29 | 7991894 | 0.029 |
Price($) | Vol. | No. |
---|---|---|
0.034 | 636953 | 2 |
0.035 | 11421455 | 38 |
0.036 | 3468320 | 18 |
0.037 | 4360014 | 20 |
0.038 | 3770246 | 19 |
Last trade - 16.10pm 12/07/2024 (20 minute delay) ? |
Featured News
SYA (ASX) Chart |