yes SC that makes a lot of sense.
As does restarting the mill with NP at 8.50 when costs are 3.00-4.00
(I exclude the 5.31 as this was before the SS refurb, ladders, aircon vents, DD & electricals)
https://www.asx.com.au/asxpdf/20140813/pdf/42rfxsgjq47fmx.pdf
The mine plan has been since 2014 to start 1.1MTpa mill with 10-14ktpa concentrate.
Nothing new here except-
- $20M spent already & SS refubished to 1000m level
- GS ST have added more high grade blocks
- DD built
- SS DFS 2018 proved its a go & doubled the resources
- where the ore will come from, W BS SS GS ST
- AUD drop makes it cheaper
- NP doubling to 8.50 makes it way more profitable.
Its sitting on a plate to start up.
- Forums
- ASX - By Stock
- POS
- Ann: Investor Presentation - Noosa Mining Conference
Ann: Investor Presentation - Noosa Mining Conference, page-17
-
- There are more pages in this discussion • 31 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
FWD
Queensland's housing crisis an opportunity for ASX builder Fleetwood – and taxpayer cash a safe harbour from the storm
SKS
SKS Technologies wins US$90M award to supply power to international hyperscale data centre in Melbourne
Add POS (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.5¢ |
Change
0.001(25.0%) |
Mkt cap ! $18.56M |
Open | High | Low | Value | Volume |
0.4¢ | 0.5¢ | 0.4¢ | $9.661K | 2.404M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
90 | 66568063 | 0.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.5¢ | 16479836 | 30 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
86 | 66062563 | 0.004 |
38 | 39232259 | 0.003 |
17 | 29250475 | 0.002 |
17 | 24100201 | 0.001 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.005 | 16379696 | 28 |
0.006 | 28529180 | 19 |
0.007 | 37026598 | 36 |
0.008 | 7029072 | 16 |
0.009 | 4338007 | 13 |
Last trade - 16.10pm 12/07/2024 (20 minute delay) ? |
Featured News
POS (ASX) Chart |