VUL 0.67% $3.73 vulcan energy resources limited

Ann: PFS Presentation, page-140

  1. 954 Posts.
    lightbulb Created with Sketch. 221
    GDY project was in essence the same cycle .... extraction of superheated (over 200C) free flowing water from boreholes and then reinjection back into the reservoir so there was no net depletion of water from the reservoir...... as what VUL (& geothermal power co that they are initially co-opersting with) are proposing/currently doing.
    Major difference is GDY project was solely for electricity generation (Li demand / extraction not even on horizon then) and in the end the economics did not stack up to make it viable at the time, whereas it is principally the Li extraction driving the economics of the VUL project.
 
watchlist Created with Sketch. Add VUL (ASX) to my watchlist
(20min delay)
Last
$3.73
Change
-0.025(0.67%)
Mkt cap ! $698.1M
Open High Low Value Volume
$3.73 $3.75 $3.70 $243.0K 65.41K

Buyers (Bids)

No. Vol. Price($)
5 6958 $3.72
 

Sellers (Offers)

Price($) Vol. No.
$3.73 2468 7
View Market Depth
Last trade - 11.39am 06/09/2024 (20 minute delay) ?
VUL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.