The second image contains a bit more info so probably sitting between feasibility and development even though the DFS is due next month and not inline with the 2-3 year time line. As is stated on WWI website a lot of the DFS extracts info from the scoping study hence why it can be completed faster.
None the less there will be time between now and development with the exception of a possible take over.
- Forums
- ASX - By Stock
- WWI
- Ann: Mining Right Granted at Witwatersrand Basin Project
Ann: Mining Right Granted at Witwatersrand Basin Project, page-267
-
- There are more pages in this discussion • 19 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
Add WWI (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.6¢ |
Change
0.001(6.67%) |
Mkt cap ! $40.66M |
Open | High | Low | Value | Volume |
1.6¢ | 1.6¢ | 1.4¢ | $30.50K | 2.044M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 256780 | 1.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.6¢ | 879999 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 256780 | 0.015 |
11 | 6178999 | 0.014 |
6 | 2407587 | 0.013 |
4 | 2507223 | 0.012 |
7 | 609033 | 0.011 |
Price($) | Vol. | No. |
---|---|---|
0.016 | 379999 | 3 |
0.017 | 3975133 | 7 |
0.018 | 962560 | 5 |
0.019 | 270000 | 1 |
0.020 | 1905000 | 5 |
Last trade - 15.39pm 04/10/2024 (20 minute delay) ? |
Featured News
WWI (ASX) Chart |