TSO 9.09% 2.5¢ tesoro gold ltd

Ann: Maiden Mineral Resource Estimate sets foundation at El Zorro, page-80

  1. 500 Posts.
    lightbulb Created with Sketch. 88
    Peter I think was off the mark, Something has gone wrong with that POG either they f*ed it up and ran with it or its their actual figure!
    I agree with their method of using higher POG for resource because our resource is not defined fully yet, mostly it is in inferred category. It doesn't mean that we are not profitable with lower POG, this pit is to only constrain the resource not for a scoping study Most of the continuity in mineralization is not defined yet, it needs infill drilling therefore most of the resource is in inferred category, with that resource we cannot use a low POG pit, it would only lower the resource inside the pit artificially. Also they didn't mention geotechnical parameters like pit slopes for this study because this MRE, not scoping study. In scoping study they will put more detail on the pit, at this stage it is to capture most of the resource that is mineable

 
watchlist Created with Sketch. Add TSO (ASX) to my watchlist
(20min delay)
Last
2.5¢
Change
-0.003(9.09%)
Mkt cap ! $37.83M
Open High Low Value Volume
2.8¢ 2.8¢ 2.4¢ $24.60K 954.1K

Buyers (Bids)

No. Vol. Price($)
1 300000 2.4¢
 

Sellers (Offers)

Price($) Vol. No.
2.6¢ 156017 1
View Market Depth
Last trade - 15.35pm 05/08/2024 (20 minute delay) ?
TSO (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.