AEV 0.00% 1.1¢ avenira limited

bfs due in 6 weeks

  1. 675 Posts.
    Having a look back at the timetable from the last preso it appears the Bank Feasability Study is due at the end of the 3rd quarter meaning 6 weeks.

    Any chance of a re-rating?
 
watchlist Created with Sketch. Add AEV (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.