The mine site would have always been a preferred outcome in my view however it would never have stacked up with water usage.
Funnily enough after SMS develop a water recycling plant for Darwin, the NTEPA ask them to consider the mine site. Maybe it is now viable.
Either way NTEPA have asked TNG to consider it so for me its either Darwin or Mt. Peake. I couldn't see if going south to SA or overseas.
- Forums
- ASX - By Stock
- TVN
- Ann: Engineering firm engaged for Vanadium Electrolyte production
Ann: Engineering firm engaged for Vanadium Electrolyte production, page-22
-
- There are more pages in this discussion • 78 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TVN (ASX) to my watchlist
|
|||||
Last
6.7¢ |
Change
-0.001(1.47%) |
Mkt cap ! $110.2M |
Open | High | Low | Value | Volume |
6.9¢ | 7.0¢ | 6.7¢ | $49.12K | 721.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 220052 | 6.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.8¢ | 98020 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 220052 | 0.067 |
6 | 535191 | 0.066 |
4 | 396153 | 0.065 |
4 | 262625 | 0.064 |
3 | 220000 | 0.063 |
Price($) | Vol. | No. |
---|---|---|
0.068 | 98020 | 2 |
0.069 | 63100 | 2 |
0.070 | 38000 | 1 |
0.072 | 96840 | 1 |
0.073 | 25320 | 1 |
Last trade - 16.10pm 05/07/2024 (20 minute delay) ? |
Featured News
TVN (ASX) Chart |