VPR 0.00% 0.2¢ volt group limited

dramatic upside potential, page-52

  1. 48 Posts.
    Thanks for that Redux and others.

    What do you guys think about the fact that the trial Power Box at Stora Enso in Sweden has experienced problems since it was first installed back in Feb 2008 and is yet to be up and running in full capacity?

    And that is with the Opcon engineers a few hours away, let alone on the other side of the planet.

    I like this stock a lot, but my key issues are:

    - Stora Enso issues
    - capital structure and dilution that is occuring and will occur before this thing is up and running. Over 400 million shares already and they will need to raise several more times before they are cash flow positive. Lots of shares issued at 1c etc, means big big overhang.
 
watchlist Created with Sketch. Add VPR (ASX) to my watchlist
(20min delay)
Last
0.2¢
Change
0.000(0.00%)
Mkt cap ! $21.43M
Open High Low Value Volume
0.2¢ 0.2¢ 0.2¢ $25 12.5K

Buyers (Bids)

No. Vol. Price($)
27 24792104 0.1¢
 

Sellers (Offers)

Price($) Vol. No.
0.2¢ 66633000 41
View Market Depth
Last trade - 10.09am 26/07/2024 (20 minute delay) ?
VPR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.