KLL 0.00% $7.28 kalium lakes limited

Ann: BSOPP Feasibility Study Complete - New 120ktpa Base Case, page-167

  1. 167 Posts.
    lightbulb Created with Sketch. 121
    OPEX and AISC accounting treatments are different. Here is the same BFS. OPEX around 230 USD, after sustaining costs are included, AISC measurement of operating costs is US263.
    https://hotcopper.com.au/data/attachments/3486/3486226-3ca386c9c1ee62138d0189db50e47229.jpg

    Sustaining costs were classified with CAPEX (incl sustaining costs). Note sustaining costs can usually be depreciated (depending on what it is) so for the DCF model the banks where using, the cashflow from depreciation needed to be taken into account.
    https://hotcopper.com.au/data/attachments/3486/3486239-13c4b9c8c350a4c0f56c2c49428ec6ab.jpg


 
watchlist Created with Sketch. Add KLL (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.