POS 14.3% 0.3¢ poseidon nickel limited

Black Swan Production Restart, page-62

  1. 5,087 Posts.
    lightbulb Created with Sketch. 2266
    Atom,

    Judging from the colouring/lighting/shadows that aerial pic looks like the one taken on 21/04/21

    More to the point, however, are you able to provide the source link for your image showing the proposed power plant for corroboration?

    It's my understanding that the Black Swan project is already connected to the mains grid, so I'm interested to know the broader context of where that proposed power plant came from.

    2014:
    Actual components/features of the BS processing plant as at July, 2014:
    https://hotcopper.com.au/data/attachments/3510/3510278-05d2d9655823dd2786439afa60814f35.jpg
    Source: "Mt Windarra Trucking to Black Swan Engineering Study (Pre-Feasibility)" announcement (13/08/14, p.3).

    2018:
    Mid-2018 commentary about on-site BS power facilities:
    https://hotcopper.com.au/data/attachments/3510/3510292-b58c776968f96a693848c18161df9e47.jpg
    Source: "Black Swan & Silver Swan Feasibility Study Supports Restart" announcement (18/07/18, p.5).

    And

    2021:
    GR Engineering CAD drawing dated June, 2021:
    https://hotcopper.com.au/data/attachments/3510/3510265-b1b75accf3853d7a58071258deac193d.jpg
    Source: "Scoping Study Completed for Black Swan Processing Options" announcement (27/07/21, p.3).




 
watchlist Created with Sketch. Add POS (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
-0.001(14.3%)
Mkt cap ! $12.61M
Open High Low Value Volume
0.4¢ 0.4¢ 0.3¢ $37.74K 10.75M

Buyers (Bids)

No. Vol. Price($)
115 80906859 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 62123539 48
View Market Depth
Last trade - 16.10pm 27/09/2024 (20 minute delay) ?
POS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.