In my opinion they may need more money to finish the construction.
I remember reading in one of the last announcements that the separation plant or whatever was still in the design stage.
Well with all the inflation/ commodity price increases we have had over the last 6 months or so I'm assuming some cost blow outs.
Most of the contracts would have already been locked in so I don't think the cost increases will be too much compared to the scope of the whole project though. Im going to sit back and wait a while before attempting to re enter.
- Forums
- ASX - By Stock
- STA
- Ann: Coburn Project Construction Update
Ann: Coburn Project Construction Update, page-8
-
- There are more pages in this discussion • 25 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STA (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $138.9M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
STA (ASX) Chart |
Day chart unavailable