Hi All
Thought I would have a look at VPE;s end of year report and the following was stated.
Growler Field: Growler 3 currently flowing 300 bopd
Growler 4 currently flowing 130 bopd
Grolwer 5 currently flowing 500 bopd
So according to this G1 and G2 are still shut in and G3 is flowing very restricted. May have to make some calls on this.
Of note was the projected Snatcher flows. They have predicted that each well will flow 400 bopd S1 coming on in October 2009 and S2 in December 2009.
I shall read on.
Add to My Watchlist
What is My Watchlist?