Hi Guys getting me head around this stock.
According to GS:
FMG cost structure:
Cash costs are around $15/wmt.
But this is wmt, where as the price of iron ore is quoted on dmt, correct?
So FMG cost structure:
$15/wmt
This is the cash cost, then, to input total costs:
Add:
Freight US$/wmt 11.1
Royalites US$ 8.6
G&A US$/wmt 0
Sustaining capex US$/wmt 6.1
Net Interest US$/wmt 0.9
Total costs US$wmt $41.5
But then this needs to be converted to dmt and for the fact that FMG iron is lower than 62%.
So GS product discount and moisture adjustment additional costs of US $43.5
This gives a FMG break even price (62% Fe dmt) of US$84.90
Does this sound correct?
I image the two variables in this would be Royalty (if iron ore prices drop royalty drops)
and
Freight: currently global elevated freight rates has resulted in the $11/wmt cost, but if freight rates come down in the future then this number will drop.
- Forums
- ASX - By Stock
- FMG
- FMG Cost Structure
FMG Cost Structure
-
- There are more pages in this discussion • 28 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FMG (ASX) to my watchlist
(20min delay)
|
|||||
Last
$18.29 |
Change
0.150(0.83%) |
Mkt cap ! $56.31B |
Open | High | Low | Value | Volume |
$18.14 | $18.38 | $18.02 | $164.0M | 9.002M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 10275 | $18.26 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$18.30 | 2897 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 10275 | 18.260 |
9 | 26169 | 18.250 |
1 | 6130 | 18.240 |
2 | 6063 | 18.230 |
2 | 6459 | 18.220 |
Price($) | Vol. | No. |
---|---|---|
18.300 | 2897 | 2 |
18.310 | 1000 | 1 |
18.320 | 1000 | 1 |
18.330 | 1400 | 1 |
18.340 | 2500 | 1 |
Last trade - 16.10pm 13/11/2024 (20 minute delay) ? |
Featured News
FMG (ASX) Chart |
The Watchlist
NUZ
NEURIZON THERAPEUTICS LIMITED
Michael Thurn, CEO & MD
Michael Thurn
CEO & MD
SPONSORED BY The Market Online