BlueScope Steel to supply pipe steel for Victorian desalination plant
10 September 2009
BLUESCOPE Steel will supply 80% of the steel used by Tyco Water to build 84km of pipe for Victoria’s desalination project, securing 900 jobs at its Hastings facility.
Tyco Water won the $150m contract from the AquaSure consortium, and will build the pipe at its Somerton factory.
The Victorian desalination plant will be Australia’s largest facility to turn sea water into drinking water. It will be operational from the end of 2011.
Tyco Water is Australia’s largest pipe manufacturer. It will produce around 6200 straight pipes for the pipeline which will transfer water from the plant site near Wonthaggi to Melbourne’s existing water network near Cardinia Reservoir.
The majority of the steel used for the pipes will be produced by BlueScope Steel in Victoria.
http://www.metalworker.com.au/article/bluescope-steel-to-supply-pipe-steel-for-victorian-desalination-plant/497916.aspx
- Forums
- ASX - By Stock
- BSL
- bsl to supply pipe steel for victorian desalin
bsl to supply pipe steel for victorian desalin, page-2
Featured News
Add BSL (ASX) to my watchlist
(20min delay)
|
|||||
Last
$21.45 |
Change
-0.170(0.79%) |
Mkt cap ! $9.466B |
Open | High | Low | Value | Volume |
$21.31 | $21.64 | $21.27 | $8.374M | 390.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
14 | 764 | $21.45 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$21.46 | 266 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 762 | 21.460 |
9 | 1358 | 21.450 |
9 | 941 | 21.440 |
7 | 785 | 21.430 |
7 | 1915 | 21.420 |
Price($) | Vol. | No. |
---|---|---|
21.470 | 108 | 8 |
21.480 | 1290 | 18 |
21.490 | 1116 | 10 |
21.500 | 2111 | 14 |
21.510 | 3559 | 9 |
Last trade - 11.51am 30/07/2024 (20 minute delay) ? |
Featured News
BSL (ASX) Chart |
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Director
Nick Poll
Executive Director
SPONSORED BY The Market Online