The fifth leighton well = tyler #4 is going down to the Eagle Ford Shale.Due to start early Oct and will take between 15-22 days.Hopefully this is the one we've been waiting for.
LU7 The Breakdown: Lithium Universe talks refinery design and lithium processing in strong preliminary feasibility study for Bécancour