Have a read of the PFS https://www.kglresources.com.au/projects/2-jervois-base-metal/docs/20201202%20KGL%20Resources%20PFS%20Annoucement%20and%20Exec%20Summary.pdf page 8 which give a summary. They have a lot to set up in two years (probably have to give that two years a bit of a stretch with latest lock down impacts) but once they push the button its a normal project build and the various components will all kick of as the gantt chart allows. Most everything will come prefabbed, so it will really be a matter of getting the first infrastructure in to support construction. The sooner they can get the air strip upgraded and a start on power and water the better.
- Forums
- ASX - By Stock
- KGL
- Ann: Update on Feasibility Study of Jervois Copper Project
Ann: Update on Feasibility Study of Jervois Copper Project, page-16
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KGL (ASX) to my watchlist
|
|||||
Last
11.0¢ |
Change
-0.005(4.35%) |
Mkt cap ! $62.40M |
Open | High | Low | Value | Volume |
11.0¢ | 11.0¢ | 11.0¢ | $11 | 100 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 99900 | 11.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
11.5¢ | 29772 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 99900 | 0.110 |
8 | 287420 | 0.100 |
1 | 5107 | 0.098 |
1 | 30009 | 0.096 |
2 | 32777 | 0.095 |
Price($) | Vol. | No. |
---|---|---|
0.115 | 29772 | 3 |
0.120 | 242684 | 1 |
0.140 | 19749 | 2 |
0.160 | 14000 | 1 |
0.190 | 2908 | 1 |
Last trade - 10.04am 21/06/2024 (20 minute delay) ? |
Featured News
KGL (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online