lists 1-2 additional BESS by 2025 to reach stated storage target of 2500mwh... one of them likely to be Townsville
BBP capacity to be 2 hours @ 50mw/100mwh - has been reported in multiple locations that the initial application stated capacity of up to 100mw/200mwh
Likely that the other two sites would be of the 50mw/150mwh size or hopefully a bit larger output and storage... obviously dependent on line capacity - but IMO 100mw/300mwh would be very appealing. Would be good to establish in QLD rapidly... also interesting that they have ignored Snowy & Shoalhaven from NSW BESS storage numbers.... makes for a very different level of installed capacity in NSW
- Forums
- ASX - By Stock
- GNX
- Ann: Battery Energy Storage System Presentation
Ann: Battery Energy Storage System Presentation, page-3
-
-
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GNX (ASX) to my watchlist
|
|||||
Last
27.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $380.9M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
GNX (ASX) Chart |
Day chart unavailable
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Director
Nick Poll
Executive Director
SPONSORED BY The Market Online