50-50 kind of update. So there was some cement in the annulus, but not quite all the way up as per the CBL run, which is why the need for further remedial cementing action & then release the rig to Waly-5.
Which means that testing is still some time away, as they need to secure the well before exposing any gas bearing sands.
I guess sometime in November when they can flowtest LD-1.
Formation tops at LD #1:
9" casing was at 3097m
Dongara at 3117,
Wagina 3165m,
Kingia 4041m,
HCS 4172m
5.5" float collar at 4220m
TD (8.5" Open hole) 4274m
- Forums
- ASX - By Stock
- NWE
- Ann: Lockyer Deep-1 Operational Update
Ann: Lockyer Deep-1 Operational Update, page-2
-
- There are more pages in this discussion • 196 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
KAI
Pilbara Minerals buys land off Kairos part of its York gold project for $20M – and a 2% royalty on any PLS gold sales
STX
Strike hands $48.5M contract to Clarke Energy to produce 20x 4.5MW gas engines for Sth Erregulla