My gut feeling is that due to the demand far outweighing the supply for the next decade, that our other projects will come online sooner than expected. As soon as the Lilac DLE process is proven, demand will accelerate the rest, either through a JV, partial or full takeover.
On the flip side, the technology could fail and we have to start digging big pools. Either way, we have a heap of country with a heap of Lithium.
Exciting times to be apart of this journey.
- Forums
- ASX - By Stock
- LKE
- 2021 and beyond
2021 and beyond, page-6842
-
-
- There are more pages in this discussion • 3,034 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LKE (ASX) to my watchlist
|
|||||
Last
4.0¢ |
Change
0.002(5.26%) |
Mkt cap ! $66.74M |
Open | High | Low | Value | Volume |
3.8¢ | 4.1¢ | 3.8¢ | $296.0K | 7.491M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 34999 | 4.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.1¢ | 348985 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 34999 | 0.040 |
8 | 780204 | 0.039 |
29 | 2155654 | 0.038 |
20 | 2334622 | 0.037 |
24 | 1855029 | 0.036 |
Price($) | Vol. | No. |
---|---|---|
0.041 | 328985 | 6 |
0.042 | 1084072 | 10 |
0.043 | 148131 | 3 |
0.044 | 1268111 | 10 |
0.045 | 1051087 | 7 |
Last trade - 16.10pm 12/07/2024 (20 minute delay) ? |
Featured News
LKE (ASX) Chart |