Not sure about the concentrator, mining is scheduled for 2023 but they should be testing our dirt in 2022, I dont know a lot about the process but I think we wont be making any cashflow (nothing material at least) until the downstream unit is running in 2024. The downstream unit uses well known technology but theres always technical and execution risk so offtakes and partnerships are basically certain.
A deal will probably involve forfeiting up to half of the ownership for the downstream subsidiary which is a shame but thats the reality, I have a feeling it will be similar to what FFX did with Ganfeng for their lithium deposit (mix of debt and equity funding for 50% equity), but with Ecopro most likely
- Forums
- ASX - By Stock
- BSX
- Ann: Blackstone to raise $60m via Placement and SPP
Ann: Blackstone to raise $60m via Placement and SPP, page-22
-
-
- There are more pages in this discussion • 25 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
IGO
IGO kicks off earn-in copper drilling on-site Encounter's Yeneena play as it adopts new identity
LKE
Lake Resources implies news article on job cuts made up; non-core sales "not material" and no rule 15.7 breach
Add BSX (ASX) to my watchlist
|
|||||
Last
3.9¢ |
Change
-0.001(2.50%) |
Mkt cap ! $20.52M |
Open | High | Low | Value | Volume |
4.0¢ | 4.2¢ | 3.7¢ | $6.798K | 169.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 82165 | 3.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.0¢ | 447218 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 82165 | 0.037 |
2 | 108333 | 0.036 |
2 | 370000 | 0.035 |
2 | 229411 | 0.034 |
5 | 240600 | 0.033 |
Price($) | Vol. | No. |
---|---|---|
0.040 | 447218 | 1 |
0.041 | 30000 | 1 |
0.042 | 34245 | 1 |
0.044 | 77221 | 3 |
0.045 | 55000 | 1 |
Last trade - 15.55pm 26/07/2024 (20 minute delay) ? |
Featured News
BSX (ASX) Chart |