@392649 @Chestermemate I would be very disappointed if the Aurora Tank JORC came out with a grade lower than 3g/t. I can't see how it is low grade no matter how you look at it. I don't think we should wish for 1-2 g/t Au. My very rough view was 6 g/t Au (+/- 2g/t).
Golf Bore is 3.29g/t and some of the other Jumbuck deposits can also be expressed as high grade for open pit. Recent resource quotations for Jumbuck deposits are on the low grade side as companies have included lots of really low grade rubbish to bulk up the ounces. I think we should be looking for a head grade of 2.5-3 g/t given the tonnage available. At this grade or better we will have a very profitable operation. 1-2 g/t won't throw off the profits that we should get out of these high grade open pit resources.
- Forums
- ASX - By Stock
- MEU
- Estimated maiden JORC at Aura Tank
Estimated maiden JORC at Aura Tank, page-7
-
- There are more pages in this discussion • 47 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MEU (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.6¢ |
Change
-0.002(5.26%) |
Mkt cap ! $39.11M |
Open | High | Low | Value | Volume |
3.6¢ | 3.6¢ | 3.6¢ | $3.744K | 104.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 173775 | 3.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.8¢ | 557871 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 173775 | 0.036 |
6 | 589346 | 0.035 |
4 | 644117 | 0.034 |
2 | 175000 | 0.033 |
3 | 78960 | 0.032 |
Price($) | Vol. | No. |
---|---|---|
0.038 | 557871 | 3 |
0.039 | 329982 | 2 |
0.040 | 262759 | 4 |
0.041 | 63562 | 2 |
0.043 | 257142 | 1 |
Last trade - 13.43pm 02/10/2024 (20 minute delay) ? |
Featured News
MEU (ASX) Chart |