Mining, transport and toll treatment at the Challenger mill will cost us around 1g/t. So if we go this route good profits can be made from Aurora Tank ore if the head grade is 2 g/t or more. Once we get to sulphide ore I think it is possible/likely that this option will be required. I am expecting grades above 3 g/t so this should be quite profitable (6g/t +/- 2g/t my rough estimate). The oxide zone at Aurora Tank is heap leachable so it could be a few years before this option is required.
Golf Bore can also produce 3 g/t head grade but the drilled zone should be heap leachable.
I don't know the costs of current heap leach operations but it would not be hard to google or ask a metallurgist. Certainly all up costs would be considerably less than the 1 g/t I quoted for toll treatment at Challenger.
- Forums
- ASX - By Stock
- MEU
- Estimated maiden JORC at Aura Tank
Estimated maiden JORC at Aura Tank, page-9
-
- There are more pages in this discussion • 45 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MEU (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.6¢ |
Change
-0.001(1.08%) |
Mkt cap ! $49.98M |
Open | High | Low | Value | Volume |
4.6¢ | 4.6¢ | 4.5¢ | $9.285K | 204.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 253019 | 4.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.6¢ | 128615 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 253019 | 0.045 |
1 | 500000 | 0.044 |
4 | 341361 | 0.043 |
2 | 35713 | 0.042 |
1 | 120000 | 0.041 |
Price($) | Vol. | No. |
---|---|---|
0.046 | 128615 | 1 |
0.047 | 634414 | 3 |
0.048 | 1638107 | 4 |
0.049 | 85741 | 2 |
0.050 | 137267 | 2 |
Last trade - 15.32pm 02/07/2024 (20 minute delay) ? |
Featured News
MEU (ASX) Chart |