IVZ 4.23% 7.4¢ invictus energy ltd

Ann: Cabora Bassa Seismic Survey Completed, page-118

  1. 3,462 Posts.
    lightbulb Created with Sketch. 793
    No, they need a 6 month lead time in order to have the Flux Capacitor ready.

    https://hotcopper.com.au/data/attachments/3773/3773895-bb80b026b43ea92ddfe2d09ec6de97ad.jpg

 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.