Drill hole WCS006 has intersected 23.8 metre down-hole at an average grade of 135.0 g/t silver and 7.32% zinc (105.6m to 129.4m) at the Webbs Consol Silver Project’s Main Shaft Prospect. Estimated true width is 12.2 metres. This is located within a broader 27.5 metre down-hole interval at an average grade of 118.1g/t silver and 6.52% zinc (104.6m to 132.1m). Estimated true width is 14.2 metres.
Follow-up Drill hole WCS007 has intersected 24.1 metre down-hole of sulphide mineralisation containing an estimated 15% sphalerite ((Zn,Fe)S) and 1% galena (PbS) (122.9m to 147.0m) proving down dip continuity of Webbs Consol Main Shaft prospect mineralisation. See Photo 1, Figure 1 and Table 2. Estimated true width is 10.4 metres. Significant silver mineralisation is also anticipated in assays.
- Forums
- ASX - By Stock
- LDR
- Ann: First drill assays received for Webbs Consol Silver Project
Ann: First drill assays received for Webbs Consol Silver Project, page-2
-
- There are more pages in this discussion • 121 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LDR (ASX) to my watchlist
(20min delay)
|
|||||
Last
8.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $9.504M |
Open | High | Low | Value | Volume |
8.9¢ | 8.9¢ | 8.9¢ | $107 | 1.204K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 9525 | 8.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.6¢ | 10000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 9525 | 0.089 |
1 | 25662 | 0.086 |
1 | 100000 | 0.085 |
1 | 50000 | 0.083 |
1 | 50000 | 0.081 |
Price($) | Vol. | No. |
---|---|---|
0.110 | 60000 | 1 |
0.115 | 15000 | 1 |
0.120 | 84999 | 2 |
0.125 | 150000 | 1 |
0.130 | 40000 | 1 |
Last trade - 11.52am 21/06/2024 (20 minute delay) ? |
Featured News
LDR (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online