@timbin4 Are you able to estimate the additional Ag ounces that could now be recovered over the initial mine life? Assuming that we are confident that the mine will be now at least 2M tonnes per annum (from 1.5M) a 33% uplift, and the original silver estimates of 1.5M ounces per annum would lift by 33% too. Then on top we now have the improved recoveries.
Calculate for the 100% Sorby Hills project.
Appreciate it.
V
- Forums
- ASX - By Stock
- BML
- Ann: Sorby Hills DFS Metallurgical Testwork Results
Ann: Sorby Hills DFS Metallurgical Testwork Results, page-10
-
- There are more pages in this discussion • 33 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BML (ASX) to my watchlist
(20min delay)
|
|||||
Last
13.0¢ |
Change
0.010(8.33%) |
Mkt cap ! $30.34M |
Open | High | Low | Value | Volume |
12.5¢ | 14.0¢ | 12.5¢ | $325.5K | 2.533M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
11 | 503628 | 12.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
13.0¢ | 2861 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
11 | 503628 | 0.125 |
16 | 328056 | 0.120 |
10 | 277242 | 0.115 |
8 | 424545 | 0.110 |
10 | 621928 | 0.105 |
Price($) | Vol. | No. |
---|---|---|
0.130 | 2861 | 1 |
0.135 | 228806 | 7 |
0.140 | 405864 | 8 |
0.145 | 516412 | 5 |
0.150 | 107473 | 8 |
Last trade - 14.02pm 17/10/2024 (20 minute delay) ? |
Featured News
BML (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non Executive Director
Simon Kidston
Non Executive Director
SPONSORED BY The Market Online