CVN 0.00% 16.5¢ carnarvon energy limited

Ann: Buffalo Project Update, page-253

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. Ya
    6,809 Posts.
    lightbulb Created with Sketch. 3829
    The rig is still at Skua with Jadestone, since arriving onsite on the 19th Sept. It was supposed to b 2 well workover operation, as these 2 have been offline since 2H-2020.

    Skua-11 had issues with its gas lift gear, not sure about the Skua 10-ST2 well. The wells were batch drilled back in 2008 by the West Atlas rig when Coogee were the Operator. Production shortfall from these 2 wells was compensated by oil produced from the nearby Swift/Swallow well.

    It is frustrating but not much one can do till they release the rig to B-10 location.

    Link to the last update on SEDAR by Jadestone.

    https://www.sedar.com/GetFile.do?lang=EN&docClass=8&issuerNo=00052177&issuerType=03&projectNo=03282820&docId=5050160
 
watchlist Created with Sketch. Add CVN (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.