Below was the timeline for THX, commencing drilling to the 1st lot of assay results.
1/5/2009 10:30 AM THX - Drilling at Thunderball Uranium Project
25/5/2009 10:01 AM THX - Drilling Intersects High Grade Uranium at Thunderball
If you apply the same timeframe to TUC
15/10/2009 12:33 PM TUC RC Driling Programme Commences
1st lot of assay results should be seen around the 9/11/2009.
Please treat the above as an assumption only.