130.9 MW is the installed power which equates to 28 MW of guaranteed output before transmission line losses of 3-5% 2 44 MW is the installed power which equates to approximately 40.3 MW of guaranteed output before transmission line losses of 3-5% 3 12.3 MW guaranteed output from turbine hall 2 4 Stage 2 of the power plant is for the potential second PLS train
(Stage 2 of the power plant is for the potential second PLS train.)
Could be understating, all good, looking to the future.
This is going to be a VERY BIG project.