BMN 3.54% $3.22 bannerman energy ltd

annual report 2009

  1. 1,605 Posts.
    The Annual Report is out. Having a quick read, I have noted the following:

    The initial drilling at the Onkelo and
    Oshiveli prospects was designed on
    a 100 x 50 metre spacing, but by the
    end of the year work had commenced
    to close this down to a 50 x 50 metre
    drill pattern through the area. Difficulty
    of access, due to the highly dissected
    and uneven nature of the terrain in
    these areas, has meant that this work
    is slow and much of it has to be
    completed by the slower drilling of
    diamond drill holes. This infill drilling
    should allow better definition of any
    shallow, contiguous higher grade
    zones in this area, which would allow
    these to be incorporated into the early
    phases of the planned mining. This
    work will also fill the gap that currently
    exists between the Oshiveli and Onkelo
    Prospects.


    Most of the surface outcrop portions
    of the known larger alaskite bodies
    in this area are poorly covered by the
    current drilling due to these being difficult
    to access using the larger track-mounted
    drill rigs. For this reason, a smaller
    man-portable diamond drilling rig has
    been incorporated into the drilling
    program until mid 2010.

    These areas (as per latest drilling report) have show much higher grades than Anomaly A. Watch this space.


    Cheers , Skip
 
watchlist Created with Sketch. Add BMN (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.