I do not like it. The world have sufficient hematite iron ore project. Hematite have to be processed in blasft furnaces.
Magnetite iron ore is needed, to concentrate the Fe content above 68% in the iron ore product. Then it can be used in DRI plants. Steel industry is switching away from blast furnaces.
I would prefer to develop magentite iron ore projects coupled with an onsite DRI plant to produce HBI.
Mike
- Forums
- ASX - By Stock
- FMG
- Ann: Exclusivity Period to Study the Belinga Iron Ore Project
Ann: Exclusivity Period to Study the Belinga Iron Ore Project, page-16
-
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FMG (ASX) to my watchlist
(20min delay)
|
|||||
Last
$19.41 |
Change
0.420(2.21%) |
Mkt cap ! $59.76B |
Open | High | Low | Value | Volume |
$19.19 | $19.55 | $19.10 | $98.59M | 5.097M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 32185 | $19.38 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$19.43 | 946 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 31185 | 19.380 |
2 | 2000 | 19.370 |
1 | 2000 | 19.360 |
1 | 10000 | 19.350 |
4 | 14530 | 19.340 |
Price($) | Vol. | No. |
---|---|---|
19.430 | 946 | 2 |
19.450 | 4300 | 2 |
19.490 | 14477 | 1 |
19.500 | 10500 | 2 |
19.510 | 78055 | 2 |
Last trade - 16.10pm 28/10/2024 (20 minute delay) ? |
Featured News
FMG (ASX) Chart |