JB,the deal at 24.5 was done when stock was about 26 so the discount was minimal. Stock rallied hard before things were finalized hence trading halt.
- Forums
- ASX - By Stock
- EXS
- placement of $10.1m to advance qld copper proj
placement of $10.1m to advance qld copper proj, page-29
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)