Your synopsis is balanced IMHO , however can covid really be blamed given it is easy to zoom a meeting with a laptop as one walks around the plant , between Germany and the engineers on site ?
I do that with my lawyers when I am on site - dont ask me what about .
Maybe outside of the summer months the surface area needed to dry out the K2So4 is increased , and if they have an insufficient footprint of pond area to account for the delayed production , then production will be lower for next CY ?
- Forums
- ASX - By Stock
- KLL
- Ann: Beyondie SOP Project - Activities Update
Ann: Beyondie SOP Project - Activities Update, page-96
-
- There are more pages in this discussion • 258 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KLL (ASX) to my watchlist
|
|||||
Last
$7.28 |
Change
0.000(0.00%) |
Mkt cap ! $2.499M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
TG1
TechGen Metals kicks off airborne geophys survey at Sally Downs copper play – a first for the permit
AVH
Avita boosts skin restoration product portfolio with 'dermal matrix' – a kind of next-level gauze made of fake skin
KLL (ASX) Chart |
Day chart unavailable